Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'ASSISTANT ENGINEER CIVIL LOCAL SELF GOVERNMENT/PWD/IRRIGATION' And exam conducted in the year 2015. And Question paper code was '130/2015'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.
76.
77,
78.
79.
80.
81.
82,
88.
84.
What is the super elevation (expressed in percentage terms) required for a road curve of
radius 1000 m if the design speed is 100 km/hour?
127 1000
A) % B %
^ त © ಶಿ
© 10% ⊾ D) तस %
Which of the following is not included in temporary adjustments of a dumpy level?
(4) setting up (B) levelling up
(C) elimination of parallax (D) centering
Among the following which represents the irrigating capacity of a unit of water :
(ക) water application efficiency (2) consumptive use efficiency
(0) ರ್ಟ (D) 8
What is the maximum size of the particle of silt?
(ಹ) 0.02 سد ര 0.002 mm
(0) 0.2mm (D) 0.06 mm
Name the well from which water flows automatically under pressure :
(A) infiltration well T (B) artesian well
(0 flowing well (D) tube well
‘Which among the following is the back bearing of N30°E?
മ 7 ¢ (B) N150°E
)0 8150 फर (1). 830717
Among the following, by which method ‘the efficiency of a sedimentation tank can عط
increased for a given discharge?
(A) by increasing the depth of the tank (B) by decreasing the depth of the tank
(C) Dby increasing the area of the tank (D) by decreasing the area of the tank
For a cantilever beam of length L, what bending moment at free end would produce a
deflection equal to that produced by a concentrated load W at free end?
@ WL छ) न
¢ WL
(0) दा D) 77
If buckling of sand is not taken into account for volumetric proportioning of concrete, what
will be the result?
(A) no effect
(B) buckling of concrete product will be the result
(0 more quantity of concrete per bag of cement will be produced
(D) லை quantity of concrete per bag of cement will be produced