10.
11.
12.
13.
14.
15.
16.
Work study is done by means of :
(4) planning chart (B) process chart
(C) stop watch (D) any one of the above
The simplex method is the basic method for :
(ക) queuing theory (ए) network analysis
(0 value analysis (D) linear programming
Statistical Quality Control is based on :
(A) probability (B) statistical inference
(C) sampling (D) none o....
See more