Page:4
Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'DRAFTSMAN GR II /TOWN PLANNING SURVEYOR GR II TOWN COUNTRY PLANNING' And exam conducted in the year 2016. And Question paper code was '165/2016'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.
24.
26.
27.
28.
30,
For an ellipse, the sum of the distances to a point on the curve from the foci is :
(9) Not a constant
(8) Constant and is equal to the length of the major axis
(൫ Constant and is equal to the length of minor axis
(D) None of these
The length to width ratio of a drawing sheet is :
ಈ ۶ج യു 1:22
© 12 യു 1
Normally earthwork is estimated for :
(ಯ) 30 mlead and 1 m lift (B) 20 m lead and 1.5 m 110
(C) 50 7 lead and 1.5 7 19 (D) 30 m lead and 1.5 m lift
The approximate cost of a building having plinth area of 300 Sq.m @Rs 1500 per Sq.m works
out as :
(മ Rs. 3,25,000 (0) ೫. 8,75,000
(0) 8 4,80,000 (D) Rs. 4,00,000
The amount provided in the estimate and bill of quantities for some specialized work to be
done by a specialist firm whose details are not known at the time of preparing estimate is
called :
(ಸಿ) Float value (ए) Fixed cost
(C) Provisional sum (D) Prime cost
The measurement is done in Sq.m for :*
(A) Thin partition wall
(0) Wood worlk for door and window frame
(C) Cement Concrete
(D) Sand filling
Pick the correct statement from the following :
(ಯ) Steel work is measured in numbers 7 Earthwork is measured in Sq.m
(0 R.C.C is measured in Cubic meter (D) All the above
The quantities of brickwork and plastering required in a wall 5 m long, 3 m high and 20 cm
thick are : ⋅
{A)3Cu.mand368q.m (B) 3.5 Cu.m and 30 Sq.m
(C) 3 Cum and 30 Sq.m (D) 30 Cumand 30 Sq.m
165/2016 6 ∎ A