Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'Junior Instructor (Draftsman Civil) Industrial Training & Engineering Asst GrII English ' And exam conducted in the year 2019. And Question paper code was '070/2019'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.
70.
71.
72.
78.
74.
5.
76.
77.
A work costing less than Rs. 20,000 is termed 88;
(ಹ). petty work {B) minor work
{C) ೫೫೦೫ ೫೦೫೬ (D) casual work
Which one is overhead expenditure of the following items?
(ಹ) Rent and taxes {B) Establishment charges
{C) Office stationery items (12) Workmen'’s compensation
The estimated quantity of cement required in cement mortar (1:6) per cubic meter will be :
வ 5.6 8 (0) 4.8bags
(© 8bags യ 8 9885
The fresh detailed estimate of the additional work in addition to the original one is called :
(ಹ) revised estimate
(8) detailed estimate
(0 supplementary estimate
(D) abstract rate
The area of cross section of trapezoidal section is of formation width ‘B’, central depth ‘d’ and
side slope ‘S’ is:
(&) ೫8048503 © ೫4-403
(೧ Bxd (D) 05(B+d)
For computing the quantity of earth work using prismoidal formula the number of required
sectional area will be:
(| ಖು number (3) even
(0 odd (D) four
Length of common rafter 17 a tiled roofing, when the rise of roof 18 1/8 span is:
(ಹ) 0.45 eave span {B) 0.50 eave span
(0) 0.55 eave span യ) 0.60 eave span
Which one of the following is not surface water?
(¢ from river diversion (3) from natural spring
{C) from reservoir storage (2) from natural lake
1 70/2019