Page:8
Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'INSPECTOR OF FACTORIES AND BOILERS GR II FACTORIES AND BOILERS' And exam conducted in the year 2016. And Question paper code was '053/2016'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.
7
60.
61.
62.
68.
64.
65.
The consumable electrede is used in :
rbon arc welding (B)
1G welding (7)
pper deviation (B)
tual deviation ()
(ക) resistance to corrosion
08) wearing qualities and high elasticity
(೧) uable cold working property
The drawing down is a process of :
(ಗಿ)
(8)
(0)
(D) bending of a bar
increasing the cross section of a bar
ducing the eross section of a bar
(५) castiron (3)
0 10 81001 ™)
ing speed (B)
(2 true rake angle D)
In break even analysis, total cost consists of :
(A) fixed cost + sales revenue (B)
(0) fixed cost + variable cost (D)
053/2016 10
MIG welding
thermit welding
lower deviation
mean deviation
joining the two surfaces of metal under pressure after heating
aluminium
none of these
nose radius
all of these
variable cost + sales revenue
fixed cost+ variable cost + profit