Kerala PSC Previous Years Question Paper & Answer

Title : DEPUTY TOWN PLANNER GREATER COCHIN DEVELOPMENT AUTHORITY
Question Code : A

Page:6


Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'DEPUTY TOWN PLANNER GREATER COCHIN DEVELOPMENT AUTHORITY' And exam conducted in the year 2016. And Question paper code was '050/2016/OL'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.

page: 6 out of 11
Excerpt of Question Code: 050/2016/OL

B:-Method of sludge dilution
C:-Method of rapid sludge digestion
D:-Method of sludge disposal
Correct Answer:- Option-D
Question49:-In the oxidation ditch, the excess sludge is taken to
A:-Anaerobic digester
B:-Aerobic digester
C:-Drying bed
D:-Incinerator
Correct Answer:- Option-C
Question50:-Which of the following industry is least polluting?
A:-Cement industry
B:-Electronic industry
C:-Rolling mills
D:-Thermal power plant
Correct Answer:- Option-B
Question51:-When the meridian of a place changes with time then this meridian will be
A:-Arbitrary
B:-Magnetic
C:-True
D:-Grid
Correct Answer:- Option-B
Question52:-The lines of force of earth's magnetic field are parallel to the earth's surface.
A:-Near to poles
B:-At right angles to poles
C:-At 45 degree to the line joining poles
D:-Near the equator
Correct Answer:- Option-D
Question53:-The bench mark established by the Survey of India Department with very high precision with reference to mean
sea level is known as
A:-GTS bench mark
B:-Permanent bench mark
C:-Arbitrary bench mark
D:-Temporary bench mark
Correct Answer:- Option-B
Question54:-When a contractor is paid certain percentage സല the actual cost of construction as his profit such contract is
termed as
A:-Lump sum contract
B:-Work order
C:-Schedule contract
D:-Cost plus percentage contract
Correct Answer:- Option-D
Question55:-Estimate expected to be least accurate is
A:-Supplementary estimate
B:-Plinth area estimate
C:-Detailed estimate
D:-Revised estimate
Correct Answer:- Option-B
Question56:-The valuation of a building depends upon
A:-lts structure and durability
B:-Size, shape and type
C:-Quality of materials used
D:-All the above
Correct Answer:- Option-D
Question57:-When the times of eariest finish and the latest finish are equal in an operation, the operation is called
കണ്ട്രി
8:4193 ‏+٤‎
‎ടലി 1+
D:-all the above

Similar Question Papers

Ask Question

(Press Ctrl+g to toggle between English and the chosen language)


Questions & Answers

DEPUTY TOWN PLANNER GREATER COCHIN DEVELOPMENT AUTHORITY : Video