Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'Draftsman Gr II/ Town Planning Surveyor Gr II, Draftsman (Civil) & Tradesman (Civil) - Town & Country Planning, KAMCO & Technical ' And exam conducted in the year 2022. And Question paper code was '034/2022'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.
034/22
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
The rate of payment is made for 100 cum (per of cum) in case of
A) rock cutting
B) earth work in excavation
C) excavation in trenches in foundation
D) all of these
Which area is included in floor area ?
A) varandhas B) supported porches
C) balconies D) walls
Damp proof course (DPC) is measured in
A) sqm B) cum C) metre D) none of these
What is scrap value at the end of utility period of building ?
A) 5% B) 10% C) 6% D) 3%
How much cum metre of cement is equal to one bag of cement ?
A) 0034 cum B) 0.0034 cum C) 0.034 cum D) 0.34 cum
What is the name of the useful area or liveable area in building ?
) plinth area B) floor area
C) circulation area D) carpet area
Which estimate is called item rate estimate ?
) plinth area estimate B) detailed estimate
C) abstract estimate D) preliminary estimate
What is the unit of measurement in MKS for brick work of thin partition wall ?
sq inch 8) 500 0) sqft D) sqm
2
What is the unit measurement in the excavation of foundation ?
A) cum B) sqm C) metre 0) பாற
The total estimate cost of a building sanitary and water supply work usually
account for
A) 3% B) 18% C) 8% D) 10%
58