Below are the scanned copy of Kerala Public Service Commission (KPSC) Question Paper with answer keys of Exam Name 'Planning Surveyor Gr II/ Overseer Gr III/ Draftsman Gr III-KSLB/ LSGD' And exam conducted in the year 21. And Question paper code was '109/21'. Medium of question paper was in Malayalam or English . Booklet Alphacode was 'A'. Answer keys are given at the bottom, but we suggest you to try answering the questions yourself and compare the key along wih to check your performance. Because we would like you to do and practice by yourself.

page: 8 out of 14
Excerpt of Question Code: 109/21

60.

61.

62.

63.

64.

65.

66.

67.

68.

The life span of iron work in roofing is :
(A) 80 years (8)
(C) 65 years ൬)

The out — turn of the mason in stone arch work is :
(ಯ) 0.30 प (8)
(C) 0.50 प (2)

75 years

85 years

0.40 713
0.60 713

Clear cover in reinforcement for foundation slabs and beams is :

(A) 30mm (B)
(C) 50mm (D)

Scrap value of a building 15 :
(A) 10% of its total cost of construction (8)
(0) 6% of its total cost of construction ൬)

40 mm

60 mm

8% of its total cost of construction

12% of its total cost of construction

For painting or varnishing of Venetian doors, one surface area should be multiplied by :

(A) One time one surface area for both sides

(2) Twotimes one surface area for both sides

(0) Twoand half times one surface area for both sides

(D) Three times one surface area for both sides

For the complete work of ornamental or large cornice, the payment is done :

(^) Perm (B)
(C) Per m3 (0)

Per m?
None of these

The incidental expenses of miscellaneous character in an estimate is :

(A) 2 to 5 % of estimated cost (8)
(0) 5008 % of estimated cost ൬)

Weight of one cubic feet portland cement is :
(A) 50kg ௫
© 21% ©)

Covered area of the building depends on :

(4) Plinth area (B)
(C) Size of the plot ൬)

109/2021 10

1 to 8 % of estimated cost

3 to 5 % of estimated cost

41 kg
45 kg

Carpet area

Floor area Ratio

Similar Question Papers

Ask Question

(Press Ctrl+g to toggle between English and the chosen language)


Questions & Answers

Planning Surveyor Gr II/ Overseer Gr III/ Draftsman Gr III-KSLB/ LSGD : Video